FIELD: hydraulic engineering construction. SUBSTANCE: method of monitoring compaction performance of inhomogeneous clayey earth involves determination of density ρα and compaction factor R for earth or its fine-grained fraction. Then lower plastic limit Wp is determined and relative humidity of earth is calculated using a Kw=(ρs-ρα)/(ρs·ρα·Wp) relation. Using correlation function between R and Kw preliminary derived in the course of investigation process or through trial compaction, compaction factor R is calculated. EFFECT: facilitated assessment of inhomogeneous clayey earth compaction performance. 1 dwg
Authors
Dates
1994-03-30—Published
1991-06-24—Filed