FIELD: construction. SUBSTANCE: embankment on serve icy permafrost grounds contains a body of embankment in the form of filed-up earth and a cooling system in the form of, at least, one row of pipes to deliver coolant. Cooling system is disposed in the embankment's bottom section. Inlet and outlet connection ports are positioned at different levels, the pipes being inclined and bell-mounted towards embankment bed. EFFECT: construction of embankments in permafrost ground environments facilitated. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF A ROAD ON PERMAFROST SOILS | 2022 |
|
RU2780999C1 |
ROAD EMBANKMENT ON PERMAFROST | 2018 |
|
RU2705656C1 |
COMBINED INLET AIR PREHEATER DEVICE | 2018 |
|
RU2714869C1 |
INDEPENDENT COOLING UNIT | 2022 |
|
RU2792466C1 |
EMBANKMENT ON HIGHLY ICED PERMAFROST SOILS | 2011 |
|
RU2487213C1 |
EMBANKMENT ON FROZEN SOIL | 2008 |
|
RU2379405C1 |
WATERWORKS FACILITY AT WATERWAY OF SEASONAL ACTION UNDER CONDITIONS OF PERMAFROST SOILS | 2010 |
|
RU2424397C1 |
WATER-ENGINEERING SYSTEM AT WATERCOURSE OF SEASONAL ACTION UNDER CONDITIONS OF PERMAFROST SOILS, COOLING UNIT AND METHOD TO OPERATE WATER-ENGINEERING SYSTEM | 2010 |
|
RU2418134C1 |
THREE-CIRCUIT SYSTEM OF ALL-SEASON THERMAL STABILIZATION OF PERMAFROST SOILS OF BASES | 2021 |
|
RU2768247C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
Authors
Dates
1994-04-15—Published
1991-07-26—Filed