FIELD: construction.
SUBSTANCE: embankment includes an embankment body in the form of filled soil and a cooling system installed in the embankment in the form of a panel with channels arranged inside. The panel with channels may be arranged in the form of a net. Holes of channels arranged at the edges of the panel are connected with a transverse air intake tube. The cooling system is arranged as follows: in the form of a row of bays made of spirally wound panels or nets with channels and installed across the axis of the road route. The cooling system may be arranged as combined of at least two layers, in which the lower one comprises bays, and the upper one - from panels with channels or tubes. Inside bays there are central tubes installed.
EFFECT: possibility to use in erection of transport structures on frozen soils, both in summer and winter periods of the year.
6 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
INDEPENDENT COOLING UNIT | 2022 |
|
RU2792466C1 |
EMBANKMENT OF THE RAILROAD ON PERMAFROST SOILS | 2017 |
|
RU2657310C1 |
EMBANKMENT ON SEVERE ICY PERMAFROST GROUNDS | 1991 |
|
RU2010919C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
METHOD OF PERMAFROST GROUNDS PROTECTION AGAINST PERENNIAL THAWING | 1997 |
|
RU2153038C2 |
METHOD OF CONSTRUCTION OF ROADS ON FROZEN SOILS | 2016 |
|
RU2641352C1 |
METHOD FOR CONSOLIDATION OF ROADBED BASE OF HIGHLY ICY GROUNDS | 1990 |
|
RU1764371C |
METHOD FOR CONSTRUCTION OF A ROAD ON PERMAFROST SOILS | 2022 |
|
RU2780999C1 |
METHOD FOR LAYING OF PIPELINE IN MEDIUM HAVING BUOYANT FORCE | 1992 |
|
RU2066806C1 |
Authors
Dates
2013-07-10—Published
2011-10-26—Filed