FIELD: building.
SUBSTANCE: invention relates to construction, namely to the construction of foundations of buildings and structures, in particular to the construction of girder and post waterproof shallow foundations. Method of monolithic erection of a shallow foundation includes excavation, installation of a formwork in working position, placement of concrete into the formwork, foundation formation, removal of the formwork, filling of open ground. Foundation is erected with an external waterproofing coating, for the arrangement of which multi-layer prefabricated waterproofing products installed in the formwork before the placement of concrete are used. Waterproofing products are installed on the inner walls of the formwork with the help of threaded studs, skipped through the products and formwork, the joints are sealed. After forming, the formwork is removed from the studs and nuts are screwed onto the protruding threaded ends of the studs, the waterproofing products are fixed on the foundation by means of the nuts.
EFFECT: technical result consists in shortening the terms and improving the quality of foundation works for the erection of the waterproof foundation by using the removable formwork with prefabricated waterproofing installed therein.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN PITS | 2023 |
|
RU2811514C1 |
METHOD FOR DAMP-PROOFING OF BELOW-GRADE BUILDING | 2006 |
|
RU2333321C1 |
METHOD FOR BLOCK-MODULAR CONSTRUCTION OF STRUCTURES IN FOUNDATION PITS AND BURIED STRUCTURE FOR MILITARY INFRASTRUCTURE FACILITIES | 2018 |
|
RU2702779C1 |
METHOD FOR CONSTRUCTION OF MONOLITHIC FOUNDATION | 1991 |
|
RU2011774C1 |
METHOD FOR CONSTRUCTING SLUDGE STORAGE PIT FOR WELL CUTTINGS AT OIL AND GAS DEPOSITS (VERSIONS) | 2014 |
|
RU2558834C1 |
MULTI-LAYER HYDRAULIC INSULATION OF UNDERGROUND STRUCTURE (DEVICE BY P.B. YURKEVICH) | 2013 |
|
RU2539456C2 |
SUBWAY STATION ERECTION METHOD (YURKEVICH(S METHOD) | 2014 |
|
RU2565314C2 |
METHOD FOR VERTICAL BOREHOLE RECONSTRUCTION | 2011 |
|
RU2459084C1 |
METHOD OF ERECTION OF MULTI-STOREY BUILDING WITH ENERGY-SAVING MULTILAYER WALLS | 2019 |
|
RU2732741C1 |
METHOD TO ERECT UNDERGROUND STRUCTURES BY "WALL IN SOIL" METHOD AND WALL IN SOIL ERECTED BY THIS METHOD | 2011 |
|
RU2465401C1 |
Authors
Dates
2018-10-10—Published
2017-12-27—Filed