FIELD: mining. SUBSTANCE: method consists in excavation of approach trench at angle to bed strike line in plan, and excavation of working trench through the entire length of open pit. Made on pit nonmining flank is stationary route at angle to bed strike line. Nonmining flank is also formed at angle to bed strike line. In this case, front of mining operations on the strike is decreased. Simultaneously with decreasing of mining front, formed on the bed strike is mining front parallel to approach trench and mined in direction square to approach trench. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENCAST MINING OF FLAT AND SLOPING DEPOSITS OF MINERALS | 1998 |
|
RU2139429C1 |
METHOD OF PREPARATION OF NEW HAULAGE LEVEL AND EXCAVATOR-RAILWAY COMPLEX FOR METHOD EMBODIMENT | 2000 |
|
RU2186982C1 |
COMBINED METHOD FOR OPENCAST MINING OF NARROW STRETCHING OUT HORIZONTAL AND SLIGHTLY INCLINED MINERAL DEPOSITS | 1992 |
|
RU2016196C1 |
METHOD OF STRIP MINING OF INCLINED MINERAL DEPOSITS | 0 |
|
SU1323715A1 |
PROCESS OF STRIP MINING OF STEEPLY DIPPING AND INCLINED DEPOSITS | 0 |
|
SU1812312A1 |
METHOD FOR FORMATION OF NONMINING FLANK OF OPEN PIT UNDER PERMAFROST CONDITIONS | 1995 |
|
RU2099528C1 |
METHOD OF OPEN WORKING OUT OF STEEP DEPOSITS WITH INTERNAL SPOIL DISPOSAL | 2013 |
|
RU2528731C1 |
METHOD FOR OPEN EXTRACTION OF STEEP-FALLING DEPOSITS WITH INTERNAL DUMP-FORMING | 2002 |
|
RU2246620C2 |
METHOD FOR OPENCAST MINING OF SLOPING AND STEEP DEPOSITS OF MINERALS | 1997 |
|
RU2148713C1 |
METHOD OF MINERAL OPENCAST MINING | 0 |
|
SU1730452A1 |
Authors
Dates
1994-04-30—Published
1991-03-11—Filed