FIELD: building industry. SUBSTANCE: method comprises steps of providing additional supports under a foundation of an edifice by drilling wells, being grouped by two for each well support; making vertical slot-type cavity by hydraulic washing out between the grouped wells and the horizontal cavity for the support; filling the cavities, had been formed, by inert material with simultaneous washing by clean water and subsequent injection of hardenable filler. A mark of the support top portion corresponds to 1.2-1.5 of mean sagging value of the edifice, construction from its central axis. EFFECT: simplified technique of levelling edifice. 2 cl, 5 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| BUILDING OR BUILDING STRUCTURE ERECTION METHOD | 2004 | 
 | RU2247810C1 | 
| METHOD FOR LEVELLING NON-UNIFORMLY SETTLED BASE PLATE OR THREE-DIMENSIONAL SOLID FOUNDATION BLOCK | 2013 | 
 | RU2545207C1 | 
| METHOD OF STRUCTURES ALIGNMENT | 2007 | 
 | RU2341621C1 | 
| TILTED BUILDING STRAIGHTENING METHOD | 2004 | 
 | RU2275473C1 | 
| BUILDING STRAIGHTENING METHOD | 2004 | 
 | RU2275474C2 | 
| METHOD FOR FOUNDATION ENHANCING | 2015 | 
 | RU2596621C1 | 
| METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 | 
 | RU2468152C1 | 
| METHOD FOR INJECTION FIXATION AND REINFORCEMENT OF BASES OF FOUNDATIONS OF DEFORMED AND RECONSTRUCTED BUILDINGS AND STRUCTURES, CARRIED OUT BY IMPREGNATING WATER-SATURATED SOILS USING LOW-VISCOSITY HIGH-PENETRATING GELLING HARDENING SOLUTION BASED ON SILICA SOL AND ORGANOSILICON COMPOSITIONS | 2024 | 
 | RU2824786C1 | 
| METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 | 
 | RU2382146C1 | 
| METHOD OF FLOATING PILE LOAD-BEARING CAPACITY INCREASE | 2004 | 
 | RU2275470C1 | 
Authors
Dates
1994-05-30—Published
1991-08-02—Filed