FIELD: construction.
SUBSTANCE: method of structures alignment includes drilling of vertical well along external edge of structures below the required level of foundation bed at the opposite side from list. Ground is excavated from under the foundation bed and structure position is fixed as soon as the list is eliminated. Besides ground is excavated from under the foundation bed to the free volumes of wells. Wells are drilled to 20-30 cm depth below the foundation bed level. Ground is then excavated by means of vibro-creeping, which is enabled by deep vibrators coming down into the each second or third vertical well. When list is eliminated, structure position is fixed by means of pressurised hardening grout supply under foundation bed through wells.
EFFECT: improvement of works safety due to process controllability; increase of productivity and reduction of costs for buildings and structures alignment on sand grounds.
2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ALIGNMENT OF STRUCTURES | 2007 |
|
RU2346113C1 |
BUILDING STRAIGHTENING METHOD | 2004 |
|
RU2275474C2 |
METHOD TO CONTROL HIGH BUILDING INCLINATION AND DEPRESSION | 2004 |
|
RU2299951C2 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
METHOD FOR FOUNDATION ENHANCING | 2015 |
|
RU2596621C1 |
METHOD TO LEVEL BUILDING, STRUCTURE | 2014 |
|
RU2575193C1 |
METHOD FOR STRAIGHTENING OF SLANT IN BUILDING ERECTED ON PILE FOUNDATION | 2008 |
|
RU2382146C1 |
METHOD OF HEELING COMPRESSION OF BUILDINGS CONSTRUCTED ON WATER - SATURATED GROUNDS | 2007 |
|
RU2348760C1 |
METHOD OF LEVELLING EDIFICES CONSTRUCTIONS | 1991 |
|
RU2013495C1 |
Authors
Dates
2008-12-20—Published
2007-02-13—Filed