FIELD: civil engineering. SUBSTANCE: cable layer comprises cutting and cable-laying blade. Said blade has an extension made of individual telescopic parts. Each of said parts has an anchor and a rigid hanger installed on horizontal guide with a provision for free shock-absorbed displacement. . EFFECT: improved design. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FASTENING UNDERGROUND PIPELINES IN MELTING PERMAFROST GROUNDS | 1988 |
|
SU1565186A1 |
METHOD OF UNDERGROUND PIPE LAYING | 0 |
|
SU1399561A2 |
METHOD OF LAYING PIPE LINE IN PERMAFROST GROUND | 1983 |
|
SU1137849A1 |
METHOD FOR UNDERGROUND PLACING PIPELINE ON UNSTABLE SOILS | 1988 |
|
SU1551008A1 |
METHOD OF LAYING UNDERGROUND PIPE LINE | 1989 |
|
SU1773141A1 |
METHOD FOR BREAKING UNDERGROUND "WARM" PIPELINE IN PERMAFROST, WEAK SOIL IN CASE OF MELTING | 1988 |
|
SU1563323A1 |
DEVICE AND METHOD OF LAYING CABLES | 2017 |
|
RU2747769C1 |
METHOD OF LAYING ABOVE-GROUND PIPELINES ALONG MOTOR ROAD IN PERMAFROST areas | 1985 |
|
SU1295855A1 |
METHOD FOR BUILDING ROAD BED | 1992 |
|
RU2043455C1 |
METHOD OF LAYING PIPELINE IN PERMAFROST | 1985 |
|
SU1598573A1 |
Authors
Dates
1994-06-15—Published
1991-06-03—Filed