FIELD: civil engineering. SUBSTANCE: widening 4 equal to value of soil melting aureole and profile following symmetrically predicted soil unstable sagging in melting aureole are made on ground surface 1 along lengthwise axis 2 of pipeline 3. Trench 5 of H width to lay down pipeline 3 with subsequent filling it with soil taken from the trench in its digging is broken in the widening. Melting unstable soil and sagging pipeline with concurrent introducing mineral soil with formation of ground core occur in the process of operation. EFFECT: decreased man-power. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL UNDERGROUND PIPELINE | 2012 |
|
RU2494302C1 |
MOTOR ROAD ON PERMAFROST | 1996 |
|
RU2128267C1 |
GROUND BED ALONG LAYOUT ROAD ON PERMAFROST | 1985 |
|
SU1301011A1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
METHOD OF PIPELINE REPAIR | 1999 |
|
RU2180718C2 |
METHOD FOR FASTENING UNDERGROUND PIPELINES IN MELTING PERMAFROST GROUNDS | 1988 |
|
SU1565186A1 |
METHOD OF LAYING PIPELINE IN PERMAFROST | 1985 |
|
SU1598573A1 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
Authors
Dates
1995-09-20—Published
1988-06-03—Filed