FIELD: oil industry. SUBSTANCE: plant has an absorber, a regenerator, rounded pipelines positioned crosswise which interconnect the absorber and the regenerator so as to connect their upper parts to lower ones respectively. The pipeline sections entering the lower part are mounted tangentially to the bodies of the absorber and the regenerator and are located below gas and air distributors. The inlet sections of upper parts of the pipelines have inclined connecting members with diameters reducing from top to the bottom which are connected to pockets located on the inner walls of the bodies. The lower parts of the absorber and the regenerator are also connected to each other and to a sulfide release unit by pipelines. The pipeline for bringing the absorber from the sulfide release unit is tangentially connected to the lower parts of the absorber and the regenerator. Their inlets are located below the gas and air distributors oppositely to inlet sections of the crosswise pipelines. The upper part of the regenerator has an air control valve connected to a pressure pickup mounted in the upper part of the absorber. The plant also has an inlet separator, an outlet separator, a pump, a compressor, feed and bleed pipelines. EFFECT: reduced material costs. 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR PREPARATION OF HYDROGEN SULFIDE- CONTAINING OIL | 0 |
|
SU1794178A3 |
GAS SWEETENING UNIT TO REMOVE HYDROGEN SULPHIDE | 2007 |
|
RU2355629C1 |
UNIT FOR NEUTRALIZATION OF HYDROGEN SULFIDE CONTAINING EFFLUENTS FROM RESERVOIR | 1991 |
|
RU2022625C1 |
INSTALLATION FOR CATCHING HYDROGEN SULFIDE-CONTAINING VAPORS | 1994 |
|
RU2077931C1 |
METHOD OF CLEANING GASES FROM HYDROGEN SULPHIDE | 2012 |
|
RU2505344C1 |
EQUIPMENT FOR GAS CLEANING OUT OF HYDROGEN SULFIDE | 2008 |
|
RU2377057C1 |
INSTALLATION OF GAS CLEANING FROM SULFUR HYDROGEN | 2016 |
|
RU2626351C1 |
METHOD FOR TREATMENT OF ASSOCIATED OIL GAS FROM HYDROGEN SULFIDE AND INSTALLATION FOR ITS REALISATION | 2008 |
|
RU2385759C2 |
HEAVY OIL AND NATURAL BITUMEN FIELD DEVELOPMENT SYSTEM | 2022 |
|
RU2780906C1 |
METHOD AND INSTALLATION FOR REMOVING HYDROGEN SULFIDE FORM GAS | 1996 |
|
RU2116121C1 |
Authors
Dates
1994-07-30—Published
1991-04-01—Filed