FIELD: construction. SUBSTANCE: forced along sides of old foundation into ground are pipes. When pipes are forced into ground, it is compacted. Pipes are secured with anchor pickups and pipe internal spaces are filled with sand-concrete, concrete or mortar fillers. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RESTORATION OF BARROW PITS FOR CONSTRUCTION OF STRUCTURES | 2008 |
|
RU2381365C1 |
METHOD OF DANGEROUS AND RECONSTRUCT ABLE BUILDING FOUNDATIONS REINFORCEMENT | 2002 |
|
RU2229562C1 |
METHOD TO REINFORCE BRICKWORK PILLARS AND THEIR COLUMNAR FOUNDATIONS | 2015 |
|
RU2600473C1 |
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR STRENGTHENING AND PROTECTION OF OLD REINFORCED CONCRETE FOUNDATIONS, PILES AND STANDS OF ELECTRIC INSTALLATIONS FROM ENVIRONMENTAL IMPACTS | 2006 |
|
RU2331737C2 |
METHOD OF PILE PRODUCTION BY IMPRESSION | 2013 |
|
RU2554368C2 |
REINFORCEMENT CONSTRUCTION FOR BUILDING OR FACILITY FOUNDATION | 2007 |
|
RU2354783C1 |
METHOD FOR REINFORCEMENT OF BUILDING FOUNDATION | 2007 |
|
RU2352722C1 |
METHOD OF RECONSTRUCTION AND VERTICAL EXTENSION OF BUILDINGS | 2015 |
|
RU2598615C1 |
Authors
Dates
1994-08-30—Published
1993-02-10—Filed