FIELD: construction.
SUBSTANCE: method for building foundation reinforcement includes development of trench along reinforced building foundation, arrangement of indents in building wall, reinforcement of foundation grill and its further concreting with provision of holes, through which tubular sections of piles are jacked, at that every pile section is connected between each other by means of transition collar. After design pressure is obtained by piles, they are armored and concreted simultaneously with openings. Openings are shaped as conical since in process of foundation grill reinforcement, in place of openings creation, there are shape-generating conical elements installed, which expand in direction of piles jacking, at that their taper is selected within the limits of 0.17-0.50.
EFFECT: improved reliability of reinforced building foundation.
3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ERECTING FOUNDATION | 2016 |
|
RU2626479C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
METHOD FOR FORTIFYING FOUNDATION OF BUILDING | 1999 |
|
RU2144111C1 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
METHOD OF REINFORCEMENT OF BUILDING FOUNDATION AND DEVICE FOR ITS EMBODIMENT | 2001 |
|
RU2191235C1 |
COMBINED (PILE-SLAB, PILE-BELT, PILE-COLUMNAR) FOUNDATION ERECTION METHOD | 2015 |
|
RU2667163C2 |
METHOD FOR RESTORING BUILDINGS WITH A VENTILATED UNDERGROUND AFTER THAWING OF THE FOUNDATION SOILS | 2021 |
|
RU2771359C1 |
FOUNDATION OF RECONSTRUCTED BUILDING | 2010 |
|
RU2431718C1 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
REINFORCEMENT OF VERTICAL PILES MADE IN SOIL AND PERCEIVING INDENTATION LOADS | 2010 |
|
RU2465403C2 |
Authors
Dates
2009-04-20—Published
2007-11-27—Filed