FIELD: hydraulic engineering. SUBSTANCE: method of constructing a glacial platform includes the cut of the glacial bed into maps, the installation on the map of water distributive compartment with pipelines and irreversible valves and a flexible reservoir under it. The water feed is exercised out of the flexible reservoir under the action of the weight of the map and of the weight distributive compartment during the sea low tide. EFFECT: simpler design. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF ICE DRILLING PLATFORM | 1993 |
|
RU2028410C1 |
METHOD OF ERECTING AN ICE PLATFORM | 0 |
|
SU844675A1 |
ICE PLATFORM CONSTRUCTION METHOD | 0 |
|
SU887716A1 |
METHOD OF CONSTRUCTING AN ICE PLATFORM | 0 |
|
SU988970A1 |
METHOD OF CONSTRUCTING AN ICE PLATFORM | 0 |
|
SU872634A1 |
METHOD TO MOUNT ICE RESISTANT PILE BASE | 1991 |
|
RU2026925C1 |
DEVICE FOR DELIVERY OF SUBMERSIBLE OBJECTS TO SEA BOTTOM | 1993 |
|
RU2088472C1 |
UNLOADING PONTOON | 1992 |
|
RU2079031C1 |
METHOD FOR MOUNTING SEA-BASED ICE-PROOF PLATFORM AND A DEVICE TO IMPLEMENT IT | 1991 |
|
RU2036268C1 |
METHOD OF ASSEMBLING ICE-PROOF PILE FOUNDATION | 0 |
|
SU827687A1 |
Authors
Dates
1994-10-30—Published
1991-08-19—Filed