FIELD: heat power engineering; atomic and thermal power stations. SUBSTANCE: plant is provided with at least two additional sliding supports each of which is located in area of clutches and has chamber which is brought in communication by at least one additional sliding support with pressure and return lines of the oil supply system; the remaining ones are brought in communication with pressure and return lines of feed water regenerative preheating system. EFFECT: enhanced efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
STEAM-TURBINE PLANT | 1988 |
|
RU1693935C |
METHOD OF OPERATION OF STEAM TURBINE PLANT AND STEAM TURBINE PLANT FOR REALIZATION OF THIS METHOD | 1996 |
|
RU2070293C1 |
STEAM TURBINE BEARING OIL SUPPLY SYSTEM | 0 |
|
SU1099114A1 |
SYSTEM FOR SAFE USE OF HYDROGEN WHILE INCREASING POWER OF DOUBLE-CIRCUIT NPP ABOVE NOMINAL | 2019 |
|
RU2736603C1 |
STEAM TURBINE PLANT WITH MAIN CONDENSATE RECIRCULATION SYSTEM AND LUBRICATION SYSTEM | 2022 |
|
RU2797086C1 |
METHOD FOR INCREASING POWER AND SAFETY OF NPP POWER UNIT WITH VVER TYPE REACTOR BASED ON HEAT ACCUMULATION | 2017 |
|
RU2680380C1 |
ELECTRIC POWER PLANT | 1993 |
|
RU2053376C1 |
HIGHLY-EFFICIENT LOW POWER STEAM-AND GAS PLANT | 1999 |
|
RU2160370C2 |
METHOD OF UNINTERRUPTED POWER SUPPLY FOR AUXILIARY NEEDS OF NPP | 2019 |
|
RU2702100C1 |
COMPLEX FOR WATER SUPPLY TO STEAM GENERATORS | 2021 |
|
RU2778594C1 |
Authors
Dates
1994-11-15—Published
1991-11-05—Filed