FIELD: tube production. SUBSTANCE: method involves cold helical rolling of billet, with temperature of material increasing to recrystallization temperature range under the action of plastic resistance; further working of billets made from non-ferrous metals, such as copper, aluminum, nickel, zirconium and titanium and their alloys. EFFECT: wider operational capabilities of method and increased efficiency. 5 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCTION OF THIN-WALLED TUBULAR BILLET FROM Nb OR Ta INGOT FOR FORMING DIFFUSION BARRIER IN SUPERCONDUCTORS (VERSIONS) | 2004 |
|
RU2285739C2 |
STAINLESS STEEL TUBES AND THEIR PRODUCTION METHOD | 2017 |
|
RU2751207C2 |
HOT ROLLED TUBE PRODUCTION PROCESS | 2004 |
|
RU2262401C1 |
PIPES FROM NICKEL-BASED ALLOY AND METHOD OF THEIR PRODUCTION | 2017 |
|
RU2731227C2 |
METHOD FOR MAKING THIN-WALL TUBES OF COPPER AND ITS ALLOYS | 2003 |
|
RU2230625C1 |
METHOD FOR PRODUCING COLD ROLLED TUBES OF LARGE- AND MEAN DIAMETER WITH IMPROVED WALL ACCURACY OF TITANIUM BASE ALLOYS | 2005 |
|
RU2288055C1 |
METHOD FOR PREPARING CONTINUOUSLY CAST COPPER BILLET FOR DRAWING | 1998 |
|
RU2146976C1 |
METHOD FOR PRODUCING HOT ROLLED COMMERCIAL AND CONVERSION TUBES OF LARGE AND MEAN DIAMETERS OF CORROSION RESISTANT HARD-TO-FORM KINDS OF STEELS AND ALLOYS IN TUBE ROLLING PLANTS WITH PILGER MILLS | 2006 |
|
RU2315673C2 |
PROCESS OF MANUFACTURE OF TUBULAR ARTICLES FROM ZIRCONIUM ALLOYS ( VERSIONS ) | 1997 |
|
RU2123065C1 |
METHOD OF PRODUCING OF HOT-ROLLED PIPES MADE OF ALPHA- AND SEMI- ALPHA-TITANIUM ALLOYS | 2007 |
|
RU2355489C2 |
Authors
Dates
1994-12-30—Published
1988-03-25—Filed