FIELD: track maintenance facilities. SUBSTANCE: device has housing 1 with guide 4 which mounts two supports 5 for rails 6. Supports 5 are rigidly interconnected by tie-rod 7 which is connected with vertical projections of body 1. Tie-rod 7 is connected with one projection by means of screw pair which forms, together with tie-rod, mechanism which provides lateral displacement of rails 6. Each support 5 for rails 6 is jack which provides displacement of rails in vertical plane. EFFECT: enhanced reliability of operation. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
RAIL BUTT JOINT | 1992 |
|
RU2023105C1 |
METHOD FOR ERECTING BANK REINFORCED WITH GEOTEXTILE | 1993 |
|
RU2068042C1 |
TRACK RELAYING MACHINE | 0 |
|
SU1024542A1 |
METHOD FOR CONSTRUCTION OF EMBANKMENT | 1990 |
|
RU2022105C1 |
METHOD FOR TEMPORARILY RESTORING LEVEL OF RAIL THREAD, DEVICE FOR ITS IMPLEMENTATION, AND METHOD OF ASSEMBLING | 2023 |
|
RU2809413C1 |
CORDUROY RAIL TRANSPORT TRACK | 2022 |
|
RU2788235C1 |
CREW SEAT WITH PARACHUTE PAN (VERSIONS) | 2014 |
|
RU2583102C2 |
FLIGHT CREW SEAT (OPTIONS) | 2014 |
|
RU2620443C2 |
MECHANISM OF MOVEMENT AND ALIGNMENT FOR CLUSTER RIG CONSTRUCTION OF WELLS | 2014 |
|
RU2577564C1 |
MACHINE FOR STRAIGHTENING RAILWAY PLACED ON CONCRETE BASE | 1992 |
|
RU2041308C1 |
Authors
Dates
1994-12-30—Published
1991-10-22—Filed