FIELD: railway building. SUBSTANCE: machine has a frame resting on chassis. Lifting/leveling unit is installed on the frame. The unit is located on back chassis. Two jacks to support the frame on railway base are installed too on the frame. The jacks are distributed across the machine and are installed in the area of said unit. Back chassis is installed on the frame so to enable that to be transposed towards front end of the machine. EFFECT: highly accurate straightening. 8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
SLEEPER PADDING MACHINE AND METHOD OF RAIL TRACK PADDING | 1994 |
|
RU2082847C1 |
TRACK-PACKING MACHINE FOR SWITCHES AND RAILROAD CROSSINGS | 1993 |
|
RU2062858C1 |
METHOD AND TIE TAMPER FOR COMPACTING RAILWAY TRACK RUBBLE | 1992 |
|
RU2048630C1 |
TRACK LINER | 1994 |
|
RU2097471C1 |
MOVABLE MACHINE FOR STRAIGHTENING RAILWAY TRACK IN PLANE AND PROFILE OF SWITCHES | 0 |
|
SU1660585A3 |
RAILWAY TRACK STRAIGHTENING MACHINE | 0 |
|
SU1540658A3 |
SLEEPER TAMPING AND NIPPING MACHINE | 1988 |
|
RU2013483C1 |
TRACK PACKING UNIT OF TRACK MACHINE | 1991 |
|
RU2015239C1 |
RAILWAY TRACK BALLAST CLEANER | 1992 |
|
RU2022074C1 |
CONTINUOUSLY MOVING MACHINE TO COMPRESS RAILROAD BALLAST OF CRUSHED STONES | 1991 |
|
RU2039142C1 |
Authors
Dates
1995-08-09—Published
1992-06-16—Filed