FIELD: railway building. SUBSTANCE: device for fastening rail to tie has chair 3 on which rail is installed, rigid clamps 5 for fixing foot of rail 1. Each clamp is mounted on chair 3 by means of hook bolt 6; device has also additional flexible clamp 9 and flexible member 8. EFFECT: enhanced reliability of fastening. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE TO ADJUST RAIL TRACK GAUGE | 2007 |
|
RU2378438C2 |
INTERMEDIATE RAIL FASTENING | 2023 |
|
RU2805596C1 |
ANCHOR CLIP-BOLT RAIL JOINT (VERSIONS) | 2011 |
|
RU2468133C1 |
INTERMEDIATE SEPARATE RAIL FASTENING | 1998 |
|
RU2156841C2 |
RAIL FASTENING ON METALLIC SLEEPER | 1992 |
|
RU2043447C1 |
METHOD OF PREVENTING FRACTURES OF RAIL LENGTHS | 1999 |
|
RU2153552C1 |
RAIL FASTENING CLAMP | 1993 |
|
RU2034944C1 |
INTERMEDIATE RAIL FASTENING | 2004 |
|
RU2257438C1 |
METHOD OF PROLONGATION OF RAIL LENGTHS SERVICE LIFE | 1999 |
|
RU2153551C1 |
RAIL JOINT ,PARTICULARLY, FOR TRACK ON FERROCONCRETE BED | 0 |
|
SU992636A1 |
Authors
Dates
1995-01-09—Published
1990-04-17—Filed