FIELD: railway automation. SUBSTANCE: device comprises progressive movement mechanism 3, movable platform 4 connected with mechanism 3, swinging motion mechanism 5 installed on platform 4 and carrying rocker arm 7 on which receiving coils 6 are secured. EFFECT: improved design. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CHECKING AUTOMATIC CAB SIGNALLING | 1992 |
|
RU2070122C1 |
AUTOMATIC CAB SIGNALLING DEVICE | 1991 |
|
RU2031807C1 |
DEVICE FOR CHECKING AUTOMATIC LOCOMOTIVE SIGNALLING | 1991 |
|
RU2035338C1 |
DEVICE FOR TESTING AUTOMATIC LOCOMOTIVE SIGNALLING SYSTEM | 0 |
|
SU1717453A1 |
DEVICE FOR CHECKING RAIL VEHICLE WHEEL FRICTION COEFFICIENT | 1999 |
|
RU2173647C2 |
DEVICE FOR INSTALLATION OF RAILROAD TRACK FASTENERS, MAINLY CLAMPS | 1991 |
|
RU2013485C1 |
INTERMEDIATE RAIL FASTENER | 1991 |
|
RU2034107C1 |
RAILWAY TRACK BRAKE | 1998 |
|
RU2167074C2 |
TIE RENEWAL MACHINE | 1991 |
|
RU2021417C1 |
UNIT FOR MOVING RAILWAY CARS | 1991 |
|
RU2017641C1 |
Authors
Dates
1995-04-30—Published
1991-05-20—Filed