FIELD: reconstruction of buildings and structures. SUBSTANCE: installed on each story under cross-bars resting on load-carrying structure are posts one under the other, and posts of upper story is loaded with permanent load from its floor. Loading is accomplished simultaneously on all stories. Applied to posts of each successive story is force equalling the sum of permanent loads of floors of overlying stories. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RELIEVING LOAD-BEARING STRUCTURES OF BUILDINGS IN SERVICE | 1994 |
|
RU2081273C1 |
DEVICE FOR UNLOADING OF LOAD-CARRYING STRUCTURES | 1997 |
|
RU2140508C1 |
DEVICE FOR RELIEVING LOAD-BEARING STRUCTURES | 1997 |
|
RU2141556C1 |
METHOD FOR RELIEVING LOAD-BEARING STRUCTURES OF OPERATING BUILDING | 0 |
|
SU1747648A1 |
GEAR UNLOADING BEARING STRUCTURES | 1994 |
|
RU2097512C1 |
FLEXIBLE SUSPENSION OF RAILWAY MONOFRAME RUNNING GEAR | 1994 |
|
RU2106271C1 |
METHOD FOR RECONSTRUCTION OF RESIDENTIAL BUILDINGS WITH WOODEN INTERMEDIATE FLOORS | 2019 |
|
RU2708289C1 |
FIXTURE TO REINFORCE STONE STRUCTURE | 1998 |
|
RU2150557C1 |
RISALITA FOR RECONSTRUCTING BUILDING | 1992 |
|
RU2054104C1 |
ANTISEISMIC BUILDING | 1996 |
|
RU2129644C1 |
Authors
Dates
1995-05-20—Published
1992-01-22—Filed