FIELD: water development works. SUBSTANCE: ship has chute in her CL which receives beam with roller conveyer and rollers resting on chute; for coupling with other ship, for example with pipe laying barge, front end of this beam is provided with pyramidal projection fitted with retainer and pipe laying barge is provided with pyramidal recess for receiving this projection. Beam consists of separate sections articulated together. EFFECT: enhanced reliability. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
SHIP LONG-CARGO LOADER | 1992 |
|
RU2068792C1 |
METHOD OF ANCHOR POSITIONING OF SHIP | 1992 |
|
RU2045441C1 |
PIPE LAYING VESSEL | 0 |
|
SU1773794A1 |
METHOD OF INSTALLATION OF LARGE-SIZED STRUCTURE FROM SHIP ON STATIONARY STRUCTURE | 1992 |
|
RU2063358C1 |
UNLOADING PONTOON | 1992 |
|
RU2079031C1 |
PIPE-LAYING BARGE WITH PIPE-WELDING SET | 0 |
|
SU1327403A1 |
PIPE LAYING VESSEL AND METHOD OF LAYING PIPE LINES (VERSIONS) | 1999 |
|
RU2230967C2 |
PIPE-LAYING VESSEL AND METHOD OF PIPE LAYING | 1999 |
|
RU2229053C2 |
METHOD AND DEVICE TO HANDLE CARGOES OF BARGE CARRIER | 2008 |
|
RU2388646C1 |
WELDING SYSTEM | 0 |
|
SU1696210A1 |
Authors
Dates
1995-06-19—Published
1992-03-20—Filed