FIELD: construction of underwater pipelines. SUBSTANCE: proposed pipe-laying vessel has tower extended upwards and defining route of pipeline at its laying, and lower guide device for directing pipeline after passing the tower. Lower guide device is furnished with groups of guide rollers spaced along pipeline route and limiting side bounds of route. Guide rollers are arranged for bending the pipeline at its passing through lower guide device. Vessel is furnished with means to control forces acting onto pipeline from side of rollers of lower guide device. Pipeline is lowered along unit of upwards extended tower of vessel, is passed through groups of spaced rollers of lower guide device by means of which side bounds of pipeline route are limited is bent at passing through lower guide device, and forces acting onto pipeline from side of rollers of lower guide device are checked. EFFECT: enlarged range of technical means. 29 cl, 20 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPE LAYING VESSEL AND METHOD OF LAYING PIPE LINES (VERSIONS) | 1999 |
|
RU2230967C2 |
PIPE-LAYING VESSEL (EMBODIMENTS) AND METHOD OF PIPELINE LAYING | 2012 |
|
RU2701981C2 |
PIPE LAYING SHIP (VERSIONS) AND METHOD OF PIPELINE LAYING (VERSIONS) | 2012 |
|
RU2606540C2 |
PIPE LAYING SHIP (VERSIONS) AND METHOD OF PIPELINE LAYING FROM SHIP | 2012 |
|
RU2597730C2 |
MARINE SHIP FOR LAYING STEEL PIPES, FLEXIBLE ELEMENTS AND UNDERWATER STRUCTURE IN ARCTIC CONDITIONS | 2012 |
|
RU2509677C1 |
EQUIPMENT FOR WELDING OF SEA PIPELINES | 2012 |
|
RU2544620C2 |
METHOD FOR MANUFACTURING PIPE-IN-PIPE UNITS ONBOARD A VESSEL | 2018 |
|
RU2741160C1 |
METHOD OF UNDERWATER PIPE LAYING, REALIZATION SYSTEM AND COMPLEXES OF JOINING PIPES USED | 2005 |
|
RU2324100C2 |
METHOD OF PIPE LAYING FROM SHIP (VERSIONS), METHODS FOR STORAGE AND PREASSEMBLY OF PIPE SECTIONS ON PIPE-LAYING SHIP (VERSIONS) AND PIPE-LAYING SHIP (VERSIONS) | 2008 |
|
RU2478862C2 |
MULTIFUNCTIONAL PIPE-LAYING VESSEL | 2013 |
|
RU2637257C2 |
Authors
Dates
2004-05-20—Published
1999-07-21—Filed