FIELD: ship load handling facilities. SUBSTANCE: device has cross supports for pipes and pipe bundle transportation mechanism in the form of winches with bands and rings on ends of bands installed on deck between pipe supports, and hooks for rings also secured on deck between supports. Similar mechanism is installed on barge onto which pipe bundles are reloaded. EFFECT: enlarged operating capabilities. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR TRANSFER OF LENGTHS OF PIPES FROM SHIP TO BARGE | 1992 |
|
RU2037452C1 |
METHOD OF ANCHOR POSITIONING OF SHIP | 1992 |
|
RU2045441C1 |
METHOD OF INSTALLATION OF LARGE-SIZED STRUCTURE FROM SHIP ON STATIONARY STRUCTURE | 1992 |
|
RU2063358C1 |
UNLOADING PONTOON | 1992 |
|
RU2079031C1 |
PIPE LAYING VESSEL | 0 |
|
SU1773794A1 |
PIPE-LAYING BARGE WITH PIPE-WELDING SET | 0 |
|
SU1327403A1 |
PIPE-LAYING VESSEL AND METHOD OF PIPE LAYING | 1999 |
|
RU2229053C2 |
PIPE LAYING VESSEL AND METHOD OF LAYING PIPE LINES (VERSIONS) | 1999 |
|
RU2230967C2 |
CARGO HOLD OF SHIP FOR CARRYING FLOATING CARGO | 0 |
|
SU1022865A1 |
DEVICE FOR DELIVERY OF SUBMERSIBLE OBJECTS TO SEA BOTTOM | 1993 |
|
RU2088472C1 |
Authors
Dates
1996-11-10—Published
1992-03-20—Filed