FIELD: methods of installation of large-sized structures from ships on stationary structures. SUBSTANCE: ship approaches stationary structure and structure to be installed on it is introduced in U-shaped cut of stationary structure; then ship is subjected to deballasting, structures are interconnected by means of ropes and ship is subjected to ballasting. EFFECT: enhanced reliability. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
SHIP LONG-CARGO LOADER | 1992 |
|
RU2068792C1 |
METHOD OF ANCHOR POSITIONING OF SHIP | 1992 |
|
RU2045441C1 |
DEVICE FOR TRANSFER OF LENGTHS OF PIPES FROM SHIP TO BARGE | 1992 |
|
RU2037452C1 |
0 |
|
SU1781384A1 | |
METHOD AND APPARATUS FOR SLIDING A SUPPORT UNIT ONTO PAIRED TRANSPORTATION PONTOONS | 0 |
|
SU1076521A1 |
DEVICE FOR DELIVERY OF SUBMERSIBLE OBJECTS TO SEA BOTTOM | 1993 |
|
RU2088472C1 |
UNLOADING PONTOON | 1992 |
|
RU2079031C1 |
SELF-ELEVATING DRILLING OFFSHORE PLATFORM | 1992 |
|
RU2066722C1 |
METHOD OF MOUNTING MARINE SELF-RAISING PLATFORM | 1997 |
|
RU2134741C1 |
MARINE ICE-RESISTANT PERMANENT PLATFORM AND METHOD OF ITS ERECTION | 1999 |
|
RU2151842C1 |
Authors
Dates
1996-07-10—Published
1992-05-12—Filed