FIELD: mining industry. SUBSTANCE: embankment is left on receiving platform along railway bed when unloading rock mass during first rum. Drilled on working bench are blast inclined holes in row most distant from embankment slope and additional and vertical holes. Then, major blasting of working bench is effected to form primary embankment of transfer point and automobile access ramp. Unloading and receiving grounds are planed with filling of fine rock mass lumps up to preset parameters. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RELOADING MINED ROCK IN COMBINED TRUCK-RAILWAY TRANSPORTATION | 2009 |
|
RU2395443C1 |
METHOD OF OPENCAST MINING OF MINERAL DEPOSITS AND EXCAVATOR-HOPPER TRANSFER POINT FOR METHOD EMBODIMENT | 2001 |
|
RU2204720C2 |
METHOD FOR OPENCAST MINING OF LUMPY AND SANDY-ARGILLACEOUS ROCKS | 1992 |
|
RU2039268C1 |
DEEP OPEN-CAST MINE TRANSPORTATION METHOD | 1992 |
|
RU2046951C1 |
METHOD OF PREPARATION OF NEW HAULAGE LEVEL AND EXCAVATOR-RAILWAY COMPLEX FOR METHOD EMBODIMENT | 2000 |
|
RU2186982C1 |
METHOD OF BUILDING AND DEPRESERVING TEMPORARILY IDLE PIT SLOPES | 0 |
|
SU1027391A1 |
METHOD FOR REACTIVATION OF OPEN PIT EDGES | 1991 |
|
RU2012810C1 |
METHOD FOR EXPLOITATION OF DEEP OPEN CUTS | 1993 |
|
RU2066760C1 |
METHOD OF OPEN DEVELOPMENT OF DEPOSITS WITH USE OF COMBINED TRANSPORT | 2014 |
|
RU2559262C1 |
METHOD OF OPENCAST MINING OF DEPOSIT OF MINERAL RESOURCES | 0 |
|
SU1794191A3 |
Authors
Dates
1995-07-09—Published
1992-01-03—Filed