FIELD: mining. SUBSTANCE: method for support of mine workings includes installation of frames of arch support, laying of flexible shells in space between support over working arch perimeter, roof lagging and partial filling of hollows behind support with cementing compound. Placed on support upper members are strips of water-proof material with pockets at the ends. Airtight flexible shells are placed between frames in space behind support of working arch. In spaces between airtight flexible shells inflated with compressed air is injected cementing compound. After hardening of cementing compound air is released from airtight shells and they are withdrawn for repeated use. EFFECT: higher stability of working. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPORTING STOPES | 0 |
|
SU1796024A3 |
YIELDING ARCH SUPPORT | 0 |
|
SU1776319A3 |
METHOD OF ROOF CONTROL IN MINE WORKINGS | 0 |
|
SU1055879A1 |
METHOD OF SUPPORT OF MINE WORKINGS AND DEVICE FOR ITS EMBODIMENT | 1995 |
|
RU2087720C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1994 |
|
RU2069759C1 |
METHOD OF TIMBERING OF DEVELOPMENT EXCAVATIONS | 2007 |
|
RU2338880C1 |
METHOD TO FIX OPENINGS | 2009 |
|
RU2439328C2 |
PROCESS OF FIXING OF ROCK WORKINGS | 1996 |
|
RU2109952C1 |
METHOD OF SUPPORTING MINE WORKINGS WITH FILLING-UP OF BEYOND-SUPPORT SPACE | 0 |
|
SU1262046A1 |
METHOD OF SUPPORTING WORKINGS | 0 |
|
SU1745953A1 |
Authors
Dates
1995-09-10—Published
1992-02-25—Filed