FIELD: mining industry. SUBSTANCE: process of fixing of rock working includes support of open surface of roof by means of makeshift lining with its subsequent movement to driven section, formation of bearing shell with the aid of forms and erection of permanent lining after this. Forms rest against supporting member, it houses spring-loaded partition coupled to mobile part of punch prop. For formation of bearing shell forms are first driven under roof, spring-loaded partition is oriented below design mark of working height and is used to consolidate hardening material to level of design mark of working. After hardening of material forms are transferred to another position. Frames of permanent roof are erected under formed bearing shell at specified design mark of working. Surface of spring-loaded forms facing roof can be coated with antiadhesive material. EFFECT: improved efficiency and reliability of process. 1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SUPPORT OF MINE WORKINGS AND DEVICE FOR ITS EMBODIMENT | 1995 |
|
RU2087720C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1994 |
|
RU2069759C1 |
METHOD OF SUPPORT OF MINE WORKINGS AND FRAME SUPPORT FOR ITS EMBODIMENT | 1995 |
|
RU2078931C1 |
DEVICE FOR DELIVERING HARDENING MATERIAL BEHIND PROGRESSIVE SHUTTERING IN SUPPORTING MINE WORKINGS | 1995 |
|
RU2096624C1 |
METHOD FOR SUPPORT OF MINE WORKINGS | 1992 |
|
RU2042032C1 |
METHOD OF SUPPORT OF DEVELOPMENT WORKINGS | 1995 |
|
RU2079660C1 |
SUPPORT FOR PROTECTION OF DEVELOPMENT WORKINGS | 1996 |
|
RU2112882C1 |
ANCHOR FOR SUPPORTING OF UNDERGROUND WORKINGS | 1996 |
|
RU2112883C1 |
MECHANIZED SUPPORT FOR LEAVING UNDERGROUND WORKINGS | 1995 |
|
RU2083845C1 |
TEMPORARY SELF-ADVANCING UNYIELDING SUPPORT FOR MINE WORKINGS | 1995 |
|
RU2087721C1 |
Authors
Dates
1998-04-27—Published
1996-08-12—Filed