FIELD: plastic metal working. SUBSTANCE: method includes sedimentation, preliminary stamping with the partial shaping of articles and final stamping with the article shaping in the dismountable die. One deep part of the article is shaped by the preliminary stamping. The final stamping is made with the change of position of the parting line of the upper and lower halves of the die relative to the beads by means of turning during the placement into the die by 180 C around the horizontal plane. The forged piece is laid into the die when the die sections are pushed out. EFFECT: enhanced efficiency of making the automotive wheels with beads by stamping. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DIE SET FOR DIE FORGING | 2000 |
|
RU2184635C2 |
FORGED PIECES FORMING METHOD | 2004 |
|
RU2275271C1 |
METHOD FOR MAKING FORGINGS WITH BRANCHES | 2001 |
|
RU2212974C2 |
METHOD OF MAKING CONE GEAR WHEELS | 0 |
|
SU1729677A1 |
METHOD FOR MANUFACTURE OF FORGED PIECE WITH HIGH HUB PORTION HAVING DEEP CAVITY BY MEANS OF HOT STAMPING | 2007 |
|
RU2344897C2 |
DIE FOR OPEN DIE-FORGING WITH AN EXPANDING FLASH BRIDGE | 2020 |
|
RU2756213C1 |
HOLLOW ARTICLES STAMPING METHOD WITH EXTERNAL FLANGE | 2019 |
|
RU2729520C1 |
METHOD OF AND PRESS TOOL FOR MANUFACTURE OF SOLID-FORGED WHEEL DISKS FOR AUTOMOTIVE VEHICLES | 1992 |
|
RU2015786C1 |
METHOD OF MANUFACTURING A QUALITY FORGING OF A SWIVEL PIN OF A LORRY | 2016 |
|
RU2649627C2 |
METHOD OF MANUFACTURE OF DIE FORGINGS | 2001 |
|
RU2218230C2 |
Authors
Dates
1995-10-10—Published
1992-04-30—Filed