FIELD: hot forging. SUBSTANCE: forging is done in two steps in tool consisting of punch with knockout, arranged inside and installed in fixed lower part of tool, and set of replaceable dies. During first step side walls of wheel disks are formed. Axial effort is converted into tool pressure onto blank metal providing its spreading to size. During second step final shaping of walls and end of blank to preset outline is provided. During first step of forging detachable die is used which is mounted on upper plate. During second step use is made of assembly die consisting of sectional inserts set into motion by upper plate and returned to initial position by resilient members. EFFECT: enhanced quality of wheel disks. 4 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAKING STAMPED IMPELLERS OF TURBINES WITH BLADES OF INTRICATE AERODYNAMIC CONFIGURATION AND DIE FOR CARRYING OUT THE METHOD | 1992 |
|
RU2016693C1 |
METHOD OF MAKING IRREGULARLY SHAPED ARTICLES | 1992 |
|
RU2045369C1 |
DIE SET FOR DIE FORGING | 2000 |
|
RU2184635C2 |
METHOD AND DEVICE FOR STAMPING BLINGS | 2021 |
|
RU2769333C1 |
METHOD OF MAKING CONE GEAR WHEELS | 0 |
|
SU1729677A1 |
DIE FOR OPEN DIE-FORGING WITH AN EXPANDING FLASH BRIDGE | 2020 |
|
RU2756213C1 |
0 |
|
SU558948A1 | |
DIE FOR OPEN VOLUMETRIC FORMING WITH EXPANDING FLASH BRIDGE | 2019 |
|
RU2732514C1 |
METHOD AND DEVICE FOR BLISK STAMPING | 2021 |
|
RU2766625C1 |
WHEEL PRODUCTION METHOD | 2000 |
|
RU2183148C2 |
Authors
Dates
1994-07-15—Published
1992-06-10—Filed