FIELD: hydraulic engineering. SUBSTANCE: spatial blocks include vertical member 1 anchor slab 2, anchor ties and are made in form of geometrically changed structure. Anchor ties 3 are hinged parallel to one another. Then, installed along embankment are mounting supports 6 to which in above-water zone vertical members 1 are attached by means of ties 7 and free space is filled with embankment ground and cap bar is mounted. EFFECT: higher efficiency. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
MOORING QUAY AND METHOD FOR ITS CONSTRUCTION | 1992 |
|
RU2032789C1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD OF RECONSTRUCTION OF BERTHING FACILITIES | 2000 |
|
RU2180028C2 |
PIPER AND METHOD OF ITS ERECTION | 1993 |
|
RU2034951C1 |
MOORING EMBANKMENT | 0 |
|
SU1395733A1 |
METHOD FOR BUILDING PIER ON ROCK BASE AND PIER ON ROCK BASE OBTAINED BY THIS METHOD | 2020 |
|
RU2757733C1 |
MOORING STRUCTURE AND METHOD OF CONSTRUCTING SAME | 0 |
|
SU1447964A1 |
MOORING EMBANKMENT | 0 |
|
SU1446215A1 |
METHOD FOR REINFORCING WATERFRONT STRUCTURES | 1999 |
|
RU2176006C2 |
METHOD OF RECONSTRUCTING MOORING EMBANKMENT ON WEAK FOUNDATION | 0 |
|
SU1423667A2 |
Authors
Dates
1995-11-27—Published
1993-03-04—Filed