FIELD: hydraulic engineering. SUBSTANCE: pier has two walls of cross bars 1 and plates 2 located between the cross bars and anchor tractions 3 hinges on the cross bars of the two walls and directed parallel to each other. During the pier erection each wall is installed on pile-supported props 5 preliminarily plunged into the ground. First the cross bars of the two walls are united in pairs into single blocks with the aid of the anchor tractions articulated on them. Then the blocks are placed between the pile-supported props and are suspended freely on them. EFFECT: enhanced efficiency. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BUILDING PIER ON ROCK BASE AND PIER ON ROCK BASE OBTAINED BY THIS METHOD | 2020 |
|
RU2757733C1 |
METHOD OF CONSTRUCTION OF THE PORT HYDRAULIC STRUCTURE | 2017 |
|
RU2656399C1 |
METHOD FOR CONSTRUCTION OF HYDRAULIC STRUCTURES ON ROCKY SOILS | 2023 |
|
RU2816995C1 |
HYDRAULIC STRUCTURE | 2022 |
|
RU2811911C2 |
MOORING QUAY AND METHOD FOR ITS CONSTRUCTION | 1992 |
|
RU2032789C1 |
HYDRAULIC STRUCTURE ON VERTICAL PILE BASE OF MODULAR STRUCTURE | 2018 |
|
RU2711973C1 |
METHOD FOR CONSTRUCTION OF WHARF EMBANKMENT FROM SPATIAL BLOCKS | 1993 |
|
RU2049190C1 |
BERTH AND METHOD OF ITS CONSTRUCTION | 2022 |
|
RU2794790C1 |
METHOD FOR THE CONSTRUCTION OF A HYDRAULIC STRUCTURE OF A NAVAL BASE | 2021 |
|
RU2775074C1 |
HYDRAULIC STRUCTURE WITH VERTICAL PROFILE ON PILE BASE AND METHOD OF ITS ERECTION | 2014 |
|
RU2568497C1 |
Authors
Dates
1995-05-10—Published
1993-03-04—Filed