FIELD: construction.
SUBSTANCE: invention relates to the field of hydraulic engineering and may be used to eliminate filtration via a body of low-head dams of storage ponds, dams of river beds and canals. An anti-filtration membrane of low-head dams and dykes from soil materials includes a waterproof wall. The wall is assembled from boards of two types - A and B. Boards are made of polyolefine wastes. Boards have semi-cylindrical ledges and grooves. Boards of type A are equipped with a longitudinal cylindrical cavity and an inverse filter from geotextile. The inverse filter is arranged at sides of the membrane. It becomes possible to efficiently determine the position of a depression curve in the dam body.
EFFECT: increased operational reliability.
6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
LOW-PRESSURE GROUND OVERFLOW DAM WITH DOUBLE PRESSURE ON A PERMAFROST BASIS | 2022 |
|
RU2785457C1 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
METHOD TO BUILD EARTH WATER-RETAINING CONSTRUCTION IN WARM SEASON (VERSIONS) | 2009 |
|
RU2426832C1 |
RESERVE SPILLWAY OF SOIL RETAINING STRUCTURE (VERSIONS) | 2014 |
|
RU2573328C2 |
EARTH DAM | 2007 |
|
RU2346107C2 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2418133C1 |
UNIT OF GROUND DAM COUPLING WITH CONCRETE STRUCTURE | 2010 |
|
RU2415996C1 |
RESERVE SPILLWAY OF EARTH DAM | 2012 |
|
RU2498007C1 |
METHOD FOR CREATING AN ANTI-FILTRATION SAND-SAPROPEL CURTAIN | 2021 |
|
RU2778149C1 |
METHOD FOR PREVENTIVE PROTECTION OF HYDRAULIC STRUCTURES BY PRE-WINTER LOWERING OF WATER LEVEL IN RESERVOIR | 2018 |
|
RU2685476C1 |
Authors
Dates
2015-01-10—Published
2013-04-08—Filed