FIELD: mechanical engineering. SUBSTANCE: pressure bushing moves axially. A chamber stuffing based on asbestos is squeezed and conditioned for some time. The bushing is then loosened. Before mounting, a stuffing made of asbestos-rubber is impregnated with a melted grease mixed with graphite as 1: 1. After squeezing the stuffing is conditioned for 15-30 min. One or two rings are then added and the primary running in is then performed for 15-30 min. The stuffing must not be overheated or ignited in so doing. The bushing is loosened when the rings are expanded. EFFECT: simplified method. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
WELLHEAD BLOWOUT PREVENTION STUFFING BOX WITH HIGH WATER CUT OF WELLS | 2021 |
|
RU2775401C1 |
GLAND SEAL | 0 |
|
SU1350430A1 |
STUFFING BOX SEAL | 1997 |
|
RU2155896C2 |
CASING-HEAD STUFFING BOX | 2002 |
|
RU2212516C1 |
METHOD FOR SEALING THE WELLHEAD OPERATED BY THE INSTALLATION OF A DOWNHOLE SUCKER ROD PUMP WITH PRODUCT LIFTING ALONG THE PRODUCTION STRING, AND A SELF-ALIGNING WELLHEAD SEAL SEALING DEVICE FOR SEALING THE WELLHEAD WHEN REPLACING STUFFING BOX SEALS | 2021 |
|
RU2769792C1 |
SHUTOFF VALVE | 2011 |
|
RU2484345C1 |
AUGER DRILL SWIVEL (VARIANTS) | 2004 |
|
RU2274724C1 |
CASING-HEAD STUFFING BOX FOR SUCKER-ROD PUMP | 2004 |
|
RU2260672C1 |
STUFFING BOX SEAL | 0 |
|
SU804968A1 |
VALVE | 0 |
|
SU947558A1 |
Authors
Dates
1996-06-10—Published
1992-01-27—Filed