FIELD: construction of pipelines, including under obstructions. SUBSTANCE: pipeline comprises connected by flexible belt 5 segments 4 with stiffening ribs 6, and arched section 3. Segments 4 are suspended on pipeline 1 while on their stiffening ribs 6 arched section 3 is installed. Under the action of embankment weight and transport load segments 4 are compressed pipeline 1 increasing its stiffness. EFFECT: increased stiffness. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
CULVERT (VARIANTS) AND METHOD FOR ITS CONSTRUCTION | 2005 |
|
RU2303096C2 |
WATER CONVEYANCE STRUCTURE UNDER EMBANKMENT | 1995 |
|
RU2079599C1 |
CULVERT | 1991 |
|
RU2025552C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
SPACE BLOCK OF COATING | 0 |
|
SU1620557A1 |
UNDER-DAM WATER PASSAGE STRUCTURE | 0 |
|
SU1740528A1 |
CULVERT UNDER BANK | 2008 |
|
RU2373329C1 |
METHOD FOR REPAIR OF PIPE CULVERT UNDER BANK | 2011 |
|
RU2479688C2 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
SECTIONAL CASING OF WELL | 1995 |
|
RU2085697C1 |
Authors
Dates
1996-06-27—Published
1993-09-03—Filed