FIELD: construction. SUBSTANCE: pit is dug out and existing brook 3 is partitioned. Accumulated water is withdrawn to the other side of pipeline 4. Flexible channel 1 is laid into drained brook bottom and, with the aid of wire rope located under pipeline 4, channel 1 is pulled downstream the brook up to the equal distance of channel ends from the center of pipeline 4. Then, heads 2 are brought into ends of flexible channel 1. Flexible water conveyance channel 1 is tightly pressed to bottom of brook 3 on the lower part of half-perimeter of pipeline 4. Panel 5 of nonwoven synthetic material is laid over flexible channel 1 and pipe 4 from its center, and its ends are secured by filled ground. EFFECT: preserved insulation, excluded labor input for water conveyance with pipeline laid in embankment for transportation of medium with positive temperature. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
CULVERT UNDER THE EMBANKMENT | 2017 |
|
RU2660699C1 |
WATER-ESCAPE STRUCTURE UNDER EMBANKMENT | 1998 |
|
RU2137972C1 |
CULVERT (VARIANTS) AND METHOD FOR ITS CONSTRUCTION | 2005 |
|
RU2303096C2 |
CULVERT UNDER EMBANKMENT | 0 |
|
SU1532637A1 |
PIPE LINE WEIGHTING MATERIAL AND METHOD OF ITS MOUNTING | 1993 |
|
RU2054595C1 |
METHOD OF REPAIRING SLUGGED OR ERODED SECTION OF PIPELINE | 2004 |
|
RU2285186C2 |
PIPELINE UNDER EMBANKMENT | 1993 |
|
RU2062937C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERWATER PIPE LINE | 1995 |
|
RU2081366C1 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
Authors
Dates
1997-05-20—Published
1995-02-02—Filed