FIELD: mining; applicable in safeguard of bed workings affected by stoping. SUBSTANCE: length of worked part of bed is taken equal to multiple of total distance between main natural fissures of main roof in direction of bed extraction advance. Breakage face of worked part of bed is advanced by the entire line toward working which is safeguarded by coal pillar from the adverse effect of stoping. Bed is worked in direction with dipping of main natural fissures of main roof from the line of breakage face towards worked out space. EFFECT: reduced expenditures for support and maintenance of workings, and increased stability of workings. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SUPPORTING MINE WORKINGS IN ADJACENT COAL SEAMS | 1999 |
|
RU2167301C1 |
METHOD FOR PROTECTION OF REUSED WORKINGS | 1991 |
|
RU2013546C1 |
METHOD OF SAFEGUARDING MINE WORKINGS | 0 |
|
SU1467183A1 |
METHOD FOR MINING MINERAL DEPOSITS AT LARGE DEPTH | 1991 |
|
RU2013548C1 |
METHOD FOR WORKING PROTECTION PILLARS IN GROUP OF HEADINGS IN THICK BUMP-RISKY SEAMS | 1996 |
|
RU2103508C1 |
METHOD FOR SUPPORTING MINING WORKINGS WITH LOOSE ROOF ROCK BY ANCHOR SUPPORT | 1997 |
|
RU2128773C1 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
METHOD TO PROTECT ROCK BUMP HAZARDOUS FLAT-LYING SEAMS AGAINST IMPACTS | 2006 |
|
RU2312990C1 |
METHOD OF MINING OF THICK INCLINED OUTBURST-PHONE SEAM | 1998 |
|
RU2143074C1 |
METHOD FOR MINING GENTLY DIPPING COAL SEAMS | 0 |
|
SU1789024A3 |
Authors
Dates
1998-11-20—Published
1997-07-04—Filed