FIELD: mechanical working of materials, in particular, methods of manufacture of parts made of porous materials. SUBSTANCE: blank 2 preliminarily filled with fusible substance is placed in mould 1, which is then compacted by punch 4 heated by heater 3 above the melting point of the fusible substance; punch 4 has drain duct 5 used to gradually discharge the melt simultaneously decreasing the compaction force. EFFECT: facilitated procedure. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAKING ELASTIC MEMBERS OF WIRE MATERIAL | 2002 |
|
RU2199413C1 |
METHOD FOR MAKING RADIAL ELASTIC-DAMPING SLIDING BEARINGS | 2000 |
|
RU2194890C2 |
METHOD OF PRODUCING PARTS FROM NON-ORDERED STRUCTURE MATERIALS | 0 |
|
SU902947A1 |
METHOD OF BRUSH PACKING MANUFACTURE | 1996 |
|
RU2133396C1 |
METHOD FOR MAKING BUILTUP PRODUCTS WITH LENGTHWISE LAMINARITY | 1996 |
|
RU2111809C1 |
METHOD OF MAKING PRODUCTS OF POWDER MATERIALS AND APPARATUS FOR PERFORMING THE SAME | 1994 |
|
RU2060866C1 |
FILTER ELEMENT AND PREPARATION METHOD THEREOF | 2013 |
|
RU2553302C1 |
METHOD OF MANUFACTURING OF POROUS PART FROM WIRE MATERIAL | 2017 |
|
RU2663389C1 |
METHOD OF MANUFACTURE OF ARTICLES FROM POWDER MATERIALS | 1994 |
|
RU2077411C1 |
METHOD OF FILTERING ELEMENTS MANUFACTURING | 2014 |
|
RU2553877C1 |
Authors
Dates
1996-08-20—Published
1993-05-12—Filed