FIELD: well drilling. SUBSTANCE: method for formation of colmatage layer in well permeable walls includes supply of grouting mortar with dispersed phase protected from hydration. Surface layer of dispersed phase is destroyed in the spot of well of hydraulic jet of 1.6-20 MPa. Time for contact of hydraulic jet with well wall is 0.01- 0.1 s with temperature variation within 18-350 C. EFFECT: higher efficiency. 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRAULIC ISOLATION OF FORMATIONS IN COMPLETION OF WELL CONSTRUCTION | 1999 |
|
RU2194842C2 |
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
METHOD OF WELL CEMENTING | 2000 |
|
RU2208129C2 |
METHOD OF WELLBORE TREATMENT | 2002 |
|
RU2215865C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
WELL DRILLING METHOD | 2003 |
|
RU2249089C1 |
TREATMENT METHOD OF HIGH-PERMEABILITY OF WELL | 2008 |
|
RU2386786C2 |
METHOD OF SECURING WELLS | 0 |
|
SU883334A1 |
WELL CEMENTING METHOD | 0 |
|
SU1686129A1 |
METHOD OF BEDS ISOLATION | 0 |
|
SU1716089A1 |
Authors
Dates
1996-12-10—Published
1990-04-23—Filed