FIELD: oil-gas producing industry. SUBSTANCE: method includes decolmatage of well zone of water bearing bed from contaminating materials hindering isolation; formation of watertight barrier by treatment of said zone by hydraulic jets with use of hardening plugging mortar. In so doing, well zone of waterbearing bed is subjected to decolmatage by building-up of instantaneous deep pressure differential with value of 60-100 MPa. Pressure differential is alternated with reverse circulation until coming of pure fluid. Treatment by hydraulic jets with use of plugging mortar is carried out with formation of watertight barrier 50-52 mm thick. Method is used in completion of well construction before well casing, after preliminary treatment of bottom-hole formation zone. EFFECT: higher efficiency of hydraulic isolation jobs due to higher reliability and quality of jobs.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
TREATMENT METHOD OF HIGH-PERMEABILITY OF WELL | 2008 |
|
RU2386786C2 |
METHOD OF WELL CEMENTING | 2000 |
|
RU2208129C2 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
MANNER OF OIL WELL COMPLETION | 2001 |
|
RU2200230C2 |
TREATMENT METHOD OF LAYER BOTTOMHOLE | 2007 |
|
RU2359113C1 |
METHOD FOR RESERVOIR EXPOSING AND ISOLATION IN WELL WITH OIL-WATER ZONE | 2005 |
|
RU2301325C1 |
METHOD FOR EXPOSING AND ISOLATION OF RESERVOIRS IN WELL WITH OIL-WATER ZONE | 2006 |
|
RU2312976C2 |
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS | 2008 |
|
RU2379472C1 |
PROCEDURE FOR CONSTRUCTION OF WELLS OF MULTI-PAY OIL FIELD | 2010 |
|
RU2427703C1 |
Authors
Dates
2002-12-20—Published
1999-10-13—Filed