FIELD: construction of wells of various application, particularly, their casing and cementing. SUBSTANCE: method includes drilling of interval to be cemented. When opening of permeable formations, hardening material, for instance cement is introduced into drilling mud. Drilling mud with hardening material, for instance, cement is supplied by hydrauli8c jets onto well walls. In so doing, formed on well wall in wellbore zone by hydraulic jets is colmatation layer with concentration of solid phase of cement particles up to 75-90%. This provides for formation of waterproofing screen 15-30 mm thick. Then, casing string is lowered and cemented. EFFECT: higher seal of cementing due to reliable and durable isolation of entire complex of permeable formations within interval of grouting mortar rise behind casing string.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ISOLATION OF WATER-SATURATED POOLS IN OPERATIONAL WELLS | 2000 |
|
RU2174595C1 |
METHOD OF HYDRAULIC ISOLATION OF FORMATIONS IN COMPLETION OF WELL CONSTRUCTION | 1999 |
|
RU2194842C2 |
TREATMENT METHOD OF HIGH-PERMEABILITY OF WELL | 2008 |
|
RU2386786C2 |
METHOD OF WELLBORE TREATMENT | 2002 |
|
RU2215865C1 |
METHOD OF DEVELOPING WATERFLOODED OIL POOL (VERSIONS) | 2001 |
|
RU2195548C1 |
METHOD FOR FORMATION OF COLMATAGE LAYER IN WELL PERMEABLE WALLS | 1990 |
|
RU2070288C1 |
PROCESS OF COMPLETION OF WELLS | 2000 |
|
RU2165518C1 |
METHOD OF WELL COMPLETION | 1997 |
|
RU2140521C1 |
CONSTRUCTION METHOD OF DEEP WELL, PLUGGING SOLUTION FOR ITS IMPLEMENTATION AND STRUCTURE OF DEEP WELL | 2008 |
|
RU2386787C9 |
METHOD OF STRENGTHENING WELL WALL IN DRILLING | 1999 |
|
RU2153572C1 |
Authors
Dates
2003-07-10—Published
2000-12-13—Filed