FIELD: hydrotechnical construction, running of self-lifting floating drilling rig in ice-covered water areas. SUBSTANCE: sea ice-resistant ice platform is used in the following way. During period of absence of ice self-lifting floating drilling rig sails from sea ice-resistant platform for 1-3 day passage which amounts to 260 to 800 km. Areas with such radii change from 0.25 up to 2.0 mln sq.km which means that prospecting operations can be conducted. With emergence of risk of appearance of ice fields in operational area drilling rig can be towed to sea ice-resistant platform, can be installed on it and operating holes can be drilled if necessary. EFFECT: expanded operational period of drilling rig. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SLEETROOF OFFSHORE PLATFORM | 1993 |
|
RU2040638C1 |
METHOD OF BUILDING SEABORNE PLATFORM | 1994 |
|
RU2085660C1 |
METHOD FOR MOUNTING SEA-BASED ICE-PROOF PLATFORM AND A DEVICE TO IMPLEMENT IT | 1991 |
|
RU2036268C1 |
METHOD OF BUILDING SEABORNE SELF-LIFTING PLATFORM | 1994 |
|
RU2085659C1 |
PROTECTION DEVICE TO PROTECT SELF-ELEVATING FLOATING DRILLING INSTALLATION FOR EXPLORATORY WELL DRILLING IN ICE CONDITIONS AND METHOD FOR PROTECTION DEVICE CONSTRUCTION | 2006 |
|
RU2310721C1 |
MARINE ICE-RESISTANT PLATFORM | 1999 |
|
RU2154714C1 |
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT | 2008 |
|
RU2382849C1 |
ICE-RESISTANT DRILLING COMPLEX FOR DEVELOPMENT OF SHALLOW-WATER CONTINENTAL SHELF | 2020 |
|
RU2739616C1 |
METHOD OF FORMING SLEETPROOF COMPLEX FOR DEVELOPMENT OF OIL-GAS DEPOSITS ON ARCTIC SHELF AND SLEETPROOF COMPLEX FORMED BY THE METHOD | 1997 |
|
RU2123088C1 |
ICE-RESISTANT MONOPOD SELF-RISING FLOATING DRILLING RIG | 2011 |
|
RU2477351C1 |
Authors
Dates
1997-04-10—Published
1994-06-10—Filed