FIELD: hydraulic engineering. SUBSTANCE: when platform is manufactured at plant, sections of support columns are connected and welded; then reservoir consisting of two halves is connected to it and tank of bearing shoe is used as pontoon, after which support column (fully assembled) is towed to deep water where self-lifting platform is located. Support column is ballasted, then it is set in vertical position to rest against bottom. Then shaft of self-lifting platform is brought above support column which is brought into shaft by means of floating crane till it is engageable with lower-hoist mechanism. EFFECT: enhanced reliability. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING MARINE SELF-RAISING PLATFORM | 1997 |
|
RU2134741C1 |
METHOD OF BUILDING SEABORNE PLATFORM | 1994 |
|
RU2085660C1 |
METHOD OF USAGE OF SEA ICE-RESISTANT PLATFORM | 1994 |
|
RU2076919C1 |
SLEETROOF OFFSHORE PLATFORM | 1993 |
|
RU2040638C1 |
METHOD FOR MOUNTING SEA-BASED ICE-PROOF PLATFORM AND A DEVICE TO IMPLEMENT IT | 1991 |
|
RU2036268C1 |
DEVICE AND METHOD FOR ERECTING SUPPORTING COLUMNS OF SELF-RAISING FLOATING PLATFORM | 1997 |
|
RU2125631C1 |
OFFSHORE ICE-RESISTANT OIL-GAS PRODUCTION PLATFORM | 1994 |
|
RU2076171C1 |
METHOD OF AFTER-EQUIPMENT OF OFFSHORE PLATFORMS | 0 |
|
SU1070272A1 |
0 |
|
SU1783065A1 | |
METHOD TO MOUNT ICE RESISTANT PILE BASE | 1991 |
|
RU2026925C1 |
Authors
Dates
1997-07-27—Published
1994-07-20—Filed