FIELD: construction, mainly at pipe laying. SUBSTANCE: anchoring device uses anchoring rods and expansion pieces attached to the rod ends. The expansion piece is made in the form of a casing accommodating a spring with a thrust plate. Prior to installation in the casings, the springs are prestressed by a force of not less than the buoyancy force of the water- deposited soil under the pipeline. EFFECT: enhanced reliability. 14 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PROTECT SUPPORT ELEMENTS FROM FROST HEAVING OF SOIL (VERSIONS) | 2012 |
|
RU2515246C1 |
DEVICE FOR PROTECTION AGAINST HEAVE | 2014 |
|
RU2582600C1 |
ANCHOR DEVICE FOR FASTENING PIPELINE IN PERMAFROST | 2016 |
|
RU2661236C2 |
METHOD FOR ERECTING PILES IN PERMAFROST GROUND | 1993 |
|
RU2039158C1 |
SLAB FOUNDATION | 2013 |
|
RU2536527C2 |
METHOD TO INSTALL TUBULAR PILE IN PERMAFROST SOIL AT NEGATIVE AMBIENT TEMPERATURE (VERSIONS) | 2010 |
|
RU2419707C1 |
METHOD FOR PILE DRIVING IN PERMAFROST GROUND (VARIANTS) | 2005 |
|
RU2295608C2 |
FOUNDATION SLAB STRENGTHENED WITH SHELL IN PERMAFROST SOIL | 2013 |
|
RU2541692C2 |
SLAB FOUNDATION IN SOFT PERMANENTLY FROZEN SOIL | 2013 |
|
RU2529976C1 |
SOIL ANCHOR | 0 |
|
SU1477847A1 |
Authors
Dates
1997-05-10—Published
1994-01-17—Filed