FIELD: building, particularly to erect foundation bases in permafrost ground.
SUBSTANCE: method for tubular pile driving in permafrost ground involves drilling hole; installing pile in the hole and leaving it as it is inside the hole up to thermal permafrost ground regime recovery. To install pile in the ground inventive insert having diameter smaller than hole diameter in lowered in hole along central hole axis. Space between the insert and hole wall is filled with loose ground. Then the pile having inner diameter practically equal to outer diameter of the insert and opened lower end is driven in the loose ground. After that the insert is removed from hole. Other variants of pile driving are also disclosed.
EFFECT: increased building and assembly job efficiency due to decreased time of pile freezing in permafrost ground and improved load-bearing capacity of piles.
11 cl, 8 ex, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL TUBULAR PILE IN PERMAFROST SOIL AT NEGATIVE AMBIENT TEMPERATURE (VERSIONS) | 2010 |
|
RU2419707C1 |
METHOD FOR SINKING SCREW PILES INTO PERMAFROST SOIL | 2016 |
|
RU2630338C1 |
SHELL PILE WITH FILLER MATERIAL | 2012 |
|
RU2523264C2 |
SLAB FOUNDATION IN SOFT PERMANENTLY FROZEN SOIL | 2013 |
|
RU2529976C1 |
EXPANSION ANCHORING DEVICE FOR PIPELINE | 1994 |
|
RU2079030C1 |
METHOD FOR ERECTING PILES IN PERMAFROST GROUND | 1993 |
|
RU2039158C1 |
FOUNDATION SLAB STRENGTHENED WITH SHELL IN PERMAFROST SOIL | 2013 |
|
RU2541692C2 |
DEVICE FOR PROTECTION AGAINST HEAVE | 2014 |
|
RU2582600C1 |
SLAB FOUNDATION | 2013 |
|
RU2536527C2 |
METHOD OF ARRANGEMENT OF FOUNDATION SLAB ON PILES FOR LOW-TEMPERATURE PRODUCT TANK | 2013 |
|
RU2552253C1 |
Authors
Dates
2007-03-20—Published
2005-02-07—Filed