FIELD: mining; applicable in increase of stability of permanent and development workings in underground mining of minerals. SUBSTANCE: the offered method includes driving of relieving slots, anchoring of rock mass located behind the relief slot and concreting of anchors and groundsills prior to filling the slots with low-modulus material. In so doing, laid on bottom of the driven slot along its length are groundsills with holes, through which holes are drilled, and anchors are inserted into holes and concreted. Then, anchors are connected with groundsills by means of washers and nuts, and bottom of relieving slot is concreted, and slot is filled with low-modulus material. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RELIEF OF WORKING MARGINAL ROCK MASS AND SHAPED CHARGE FOR FORMATION OF INITIAL FISSURES | 1994 |
|
RU2078927C1 |
METHOD FOR BURYING RADIOACTIVE AND OTHER WASTES | 1994 |
|
RU2068206C1 |
METHOD FOR DEGASSING OF COAL-BEARING MASS | 1996 |
|
RU2103516C1 |
METHOD OF MINE WORKINGS SUPPORT | 2000 |
|
RU2177550C1 |
METHOD OF INSTALLING SCREW-IN ANCHOR | 1995 |
|
RU2081331C1 |
METHOD OF PROTECTION OF IN-BED MINE WORKINGS | 1997 |
|
RU2172837C2 |
METHOD OF GUARDING OF WORKINGS IN HEAVING SOILS | 1990 |
|
RU2007577C1 |
JUNCTION OF SHAFT WITH SHAFT-ADJOINING WORKINGS | 0 |
|
SU1555495A1 |
PROCESS OF WORKING OF COAL SEAMS | 1998 |
|
RU2164293C2 |
METHOD OF RELIEVING ROCK MASS IN MINE WORKING JUNCTIONS | 0 |
|
SU1521877A1 |
Authors
Dates
1997-05-20—Published
1995-04-19—Filed