FIELD: nonferrous metallurgy, in particular, electrolytic production of aluminium. SUBSTANCE: method sharply decreases the voltage drop across contact units of cathode chutes and increases weldability of chutes by application of current load to successive electrolyzer through anode busbars of disconnected electrolyzer with the help of shunts of different configuration, for instance, L-shaped ones. EFFECT: higher efficiency. 4 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
BUS ARRANGEMENT OF ELECTROLYZER FOR ALUMINUM PRODUCTION | 1997 |
|
RU2133303C1 |
PROCESS OF REPLACEMENT OF BUS ARRANGEMENT OF ALUMINUM ELECTROLYZERS OF OPERATIONAL SERIES | 1997 |
|
RU2118409C1 |
METHOD FOR REPLACEMENT OF FOUR-RISER BUSBAR BY THREE-RISER BUSBAR IN SODERBERG ALUMINIUM ELECTROLYSER | 2012 |
|
RU2516415C1 |
BUS ARRANGEMENT OF ELECTROLYZER PRODUCING ALUMINUM | 1998 |
|
RU2162901C2 |
BUS ARRANGEMENT OF ALUMINUM ELECTROLYZER | 1995 |
|
RU2132888C1 |
ALUMINIUM ELECTROLYZER BUSBAR | 1992 |
|
RU2009275C1 |
RUS ARRANGEMENT OF ALUMINUM ELECTROLYZER | 2000 |
|
RU2169797C1 |
BUS ARRANGEMENT OF ELECTROLYSIS CELL FOR PRODUCTION OF MAGNESIUM AND CHLORINE | 2015 |
|
RU2586186C1 |
SHUNTING UNIT OF ALUMINUM ELECTROLYZER | 2001 |
|
RU2188259C1 |
ALUMINUM ELECTROLYZER BUS ARRANGEMENT | 2003 |
|
RU2281989C2 |
Authors
Dates
1997-06-10—Published
1994-06-16—Filed