FIELD: oil and gas industry. SUBSTANCE: method refers to development of northern deposits because safety operation of them is possible only in summer period when there is no ice cover. Method implies periodic dismantling of upper part of drilling string over 100-150 m length from surface and hermetic sealing of remaining part of string. String is equipped with embracing float at preset depth above surface secured to sea bottom and holding string from side displacements. Sealing of string is effected at float level. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF RUNNING OF SEA OIL-AND-GAS FIELD AND DEVICE FOR ITS REALIZATION | 1991 |
|
RU2011791C1 |
METHOD OF OPERATION OF FLOATING STATIONARY OBJECT | 1997 |
|
RU2124453C1 |
FLOATING UNDERWATER RESERVOIR FOR COLLECTING AND STORING CRUDE OIL AND OIL PRODUCTS | 1991 |
|
RU2021959C1 |
ICE BREAKING DEVICE | 1991 |
|
RU2048372C1 |
CARGO-SHIP | 1996 |
|
RU2114024C1 |
CARGO VESSEL | 1999 |
|
RU2153999C1 |
DEVICE FOR PROTECTION OF STATIONARY MARINE STRUCTURES AGAINST DRIFT ICE | 1992 |
|
RU2065902C1 |
METHOD FOR BUILDING WELLS WITH REMOTE FACE | 2006 |
|
RU2295024C1 |
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT | 2008 |
|
RU2382849C1 |
MOORING BUOY | 1992 |
|
RU2049699C1 |
Authors
Dates
1997-06-10—Published
1993-10-12—Filed