FIELD: construction engineering. SUBSTANCE: at construction of building foundation beams of two vertical lateral flanges and one horizontal flange connecting them are placed on gravel underlayer placed on bottom of foundation pit and secured at a distance of several centimeters above underlayer. After backfill of the pit recess formed by flanges of beams is filled in with concrete, horizontal flange has holes used to feed concrete to underlayer that flows out through them at filling-in of the recess. EFFECT: facilitated procedure. 5 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
PREFABRICATED LOAD-BEARING STRUCTURE OF FLOORING AND METHOD FOR ITS FORMATION | 2020 |
|
RU2766109C2 |
METHOD FOR RECOVERY OF EXHAUSTED OPEN PITS FOR CONSTRUCTION OF STRUCTURES | 2009 |
|
RU2387837C1 |
SOLID WALL ELEMENT OF WOODWOOL STABILISED WITH CEMENT | 2005 |
|
RU2423230C2 |
METHOD FOR ERECTION AND RECONSTRUCTION OF BUILDINGS AND PRODUCTION OF ARTICLES FROM COMPOSITE MATERIALS MAINLY OF CONCRETE FOR ABOVE PURPOSES | 1996 |
|
RU2107783C1 |
WALL STRUCTURE OF EXPANDED MATERIAL AND CONCRETE, METHOD AND DEVICE FOR ITS MANUFACTURE | 1993 |
|
RU2136821C1 |
WALL | 2006 |
|
RU2347042C2 |
THREE-LAYER CONCRETE WALL PANEL AND METHOD OF ERECTING WALLS USING SUCH WALL PANELS | 2023 |
|
RU2832465C1 |
DRILLING-AND-DRIVING METHOD FOR PILE FOUNDATION ERECTION IN PERMAFROST GROUND | 2006 |
|
RU2320821C1 |
Authors
Dates
1997-06-27—Published
1991-05-27—Filed