FIELD: mining. SUBSTANCE: method includes extraction of ore by rooms with leaving pillars of various service life. Filling is carried out in rooms between pillars with short service life. Plate is formed of broken pillars and filling material. Pillars with prolonged service life are made to observe their width to height ratio of more than one. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
METHOD FOR CONTROL OF SINKING OF WORKED ROCK AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103506C1 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
METHOD FOR DEVELOPMENT OF FLAT POTASSIUM SEAMS IN CHAMBERS | 1995 |
|
RU2083828C1 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR CONTROL OF ROCK PRESSURE AT CHAMBER DEVELOPMENT OF FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2103505C1 |
METHOD TO DEVELOP POTASSIUM BEDS | 2009 |
|
RU2412351C1 |
DEVELOPMENT OF THICK FLAT-LYING POTASH BEDS | 2014 |
|
RU2567576C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
METHOD FOR THICK FLAT-LAYING POTASSIUM SEAM DEVELOPMENT | 2006 |
|
RU2310074C1 |
Authors
Dates
1997-12-10—Published
1995-08-31—Filed