FIELD: mining industry. SUBSTANCE: according to method, in stoping operations in non-explosion-risky seam, each two adjacent chambers are advanced towards each other, and formed between them is pliable pillar for supporting rock of immediate roof rock. EFFECT: high efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF CONTIGUOUS FLAT-LYING POTASSIUM SEAMS | 1996 |
|
RU2117760C1 |
METHOD FOR MINING THICK SALT OUTBURST-PRONE SEAMS WITH COMPLICATED HYPSOMETRY OF THEIR OCCURRENCE | 1991 |
|
RU2015329C1 |
METHOD OF COMBINED DEVELOPMENT OF CONTIGUOUS FORMATION OF DIFFERENT THICKNESSES | 2013 |
|
RU2532945C1 |
METHOD FOR CONTROL OF ROCK PRESSURE | 1995 |
|
RU2081316C1 |
ADJACENT POTASSIUM SEAM MINING METHOD | 0 |
|
SU1765418A1 |
METHOD FOR CHAMBER MINING WHEN PREPARING HORIZONS | 2016 |
|
RU2627803C1 |
METHOD FOR MINING OF GENTLY DIPPING POTASSIUM BEDS WITH THIN WATER-PROTECTION MASS | 1995 |
|
RU2098625C1 |
METHOD FOR MINING MINERAL GENTLY SLOPPING BEND | 1993 |
|
RU2042816C1 |
METHOD FOR THICK FLAT-LAYING POTASSIUM SEAM DEVELOPMENT | 2006 |
|
RU2310074C1 |
METHOD FOR PREPARATION OF EXCAVATION SITE AT CHAMBER DEVELOPMENT SYSTEM | 2015 |
|
RU2577570C1 |
Authors
Dates
1997-07-10—Published
1995-05-04—Filed